STEP 1

Installation Step 1

Cick below for each step:

STEP 1 Site Preparation
STEP 2
Installation of bottom row
STEP 3
Aligning and Core Filling
STEP 4
Install Additional Rows
STEP 5
Capping the Wall
STEP 6
Paragrid Soil Reinforcement
   
 
 
 
Site Preparation:
Before construction is started, utility locates should be done. Excavate for the wall to the desired width and depth to the final grade. Once the excavation for the wall is completed, start trenching the base of the wall at the lowest elevation. This trench should be at approximately 6 to 24 inches below the grade. The trench should then be compacted to 95% Standard Proctor or greater or on native soil. After the trench is complete, place approximately 4 to 8 inches of free-draining aggregate (recycled concrete 1½ x 3/4) for leveling the base.

 

 
Home-Paragon Retaining Wall Systems
 
Stone Type
 
Installation of Paragon Retaining Walls
 
Design Considerations of Pinless Retaining Wall System
 
Photo Gallery of Retaining Walls by Paragon
 
Where to Purchase Paragon Retaining Walls
 
Contact Paragon Retaining Walls
   

© 2008 Paragon Retaining Wall Systems, Inc.

Site Design & Hosting by hostwithclarity.com