Paragon Retaining Wall Installation

STEP 2

Installation Step 1

Cick below for each step:

STEP 1 Site Preparation
STEP 2
Installation of bottom row
STEP 3
Aligning and Core Filling
STEP 4
Install Additional Rows
STEP 5
Capping the Wall
STEP 6
Paragrid Soil Reinforcement
   
 
 
 
Installation of bottom row:
Place the first Paragon block unit on the prepared base, along the wall alignment, and make sure the unit is level - front to back and side to side. Repeat this process until the bottom row is installed, having the front corners touching each other. The foundation of the wall is the most important aspects of building a retaining wall. It is critical the bottom row of the wall be level and accurate. Minimum embedment of base course should be at least 2 inches below the grade for every 1-foot of wall height, up to a maximum of 8 inches.

 

 
Home-Paragon Retaining Wall Systems
 
Stone Type
 
Installation of Paragon Retaining Walls
 
Design Considerations of Pinless Retaining Wall System
 
Photo Gallery of Retaining Walls by Paragon
 
Where to Purchase Paragon Retaining Walls
 
Contact Paragon Retaining Walls
   

© 2008 Paragon Retaining Wall Systems, Inc.

Site Design & Hosting by hostwithclarity.com